400/230/132 kV GIS Substation at Purbachal on Turnkey Basis (Package-6)
The 400/230/132 kV Gas Insulated Substation (GIS) at Purbachal is a high-voltage power infrastructure project designed to strengthen the electricity transmission network in Bangladesh. This project is being executed on a turnkey basis under Package-6, ensuring reliable power distribution in Purbachal and surrounding areas.
Project Scope & Objectives
- Location: Purbachal, Dhaka, Bangladesh
- Voltage Levels: 400 kV / 230 kV / 132 kV
- Project Type: Turnkey (Engineering, Procurement, Construction, Testing & Commissioning)
- Purpose: Improve power transmission, enhance grid stability, and support future demand growth